Foto Esinor´s Project á Cerceda

Location: Mesón do Vento

City Hall: Cerceda

Number of original fixtures: 15 fixtures of conventional ballast with 250w VSAP and energy management

Installed Equipment:

  • 15 columns of 9m model Stylum Evo Vialia luminaire with 250w of VSAP, brand FDB
  • 15 ballasts RT20 250NA
  • 1 box of 3 exits CT500AB

Total power: power lamps: 250x15 = 3750 w
Power reactors: 10x15 = 150 w
Total installed power: 3900 w

Estimated savings in the installation: 8573.67 kWh per year
€ 1003.13 per year
7.72 tonnes of CO2 per year